KPlato: Difference between revisions

From KDE UserBase Wiki
(Add report snapshot)
(KPlato is no longer part of KOffice - removed links)
(5 intermediate revisions by 3 users not shown)
Line 30: Line 30:


<!--T:7-->
<!--T:7-->
* and much more. Read more details on [http://www.koffice.org/kplato/ the project's home pages]
* and much more.  
 
<!--T:8-->
:The KPlato mailing list is at [mailto:[email protected] [email protected]]
 
<!--T:9-->
:Subscription information can be found [https://mail.kde.org/mailman/listinfo/koffice here]
 


<!--T:10-->
<!--T:10-->
Line 51: Line 44:
== Hints, Tips and Tutorials == <!--T:12-->
== Hints, Tips and Tutorials == <!--T:12-->


<!--T:14-->
[[Special:MyLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''


<!--T:13-->
<!--T:13-->
[[Category:Office]]
[[Category:Office]]
</translate>
</translate>

Revision as of 11:56, 29 June 2011

KPlato Gantt view
    Manage every detail of your project

Features include:

  • Multiple views
    • Gantt Charts,
    • Resource View
    • Accounts View
  • Uses standard structures
    • Work breakdown structure (WBS)
    • Resource breakdown structure (RBS)
    • Cost breakdown structure (CBS)
  • Configurable level of detail on Gantt Chart
  • Supports Summarytasks, Tasks, and milestones
  • Configurable Scheduling Constraints
  • and much more.
Work Breakdown Structure
 
Task Status Report
Resource Breakdown Structure
 
Cost Breakdown Structure

Hints, Tips and Tutorials

Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project using KPlato