KPlato/Manual/Task Dependency Editor (Graphical): Difference between revisions

From KDE UserBase Wiki
m (Force toc)
(Add image, fix typos)
 
Line 3: Line 3:


==Description==
==Description==
The Task Dependency Editor is used to create, edit, and delete task dependencies. For convenience, tasks can also be inserted, deleted or edited.


The tasks are ordered in accordance with Work Breakdown Structure.
{|
| The Task Dependency Editor is used to create, edit, and delete task dependencies. For convenience, tasks can also be inserted, deleted or edited.
 
The tasks are ordered in accordance with the Work Breakdown Structure (WBS).
|[[Image:Kplato_dependencyeditor.png|350px]]
|}


The symbols for summary tasks, tasks and milestones is shown below:
The symbols for summary tasks, tasks and milestones is shown below:
Line 39: Line 43:
==Editing dependencies==
==Editing dependencies==
Dependencies are created by first selecting a start- or finish area of the predecessor task, then selecting the start- or finish area of the successor task.
Dependencies are created by first selecting a start- or finish area of the predecessor task, then selecting the start- or finish area of the successor task.
This can be done using the task or the keyboard.
This can be done using the mouse or the keyboard.


Alternatively you can drop the predecessors connection area on the successors connection area.
Alternatively you can drop the predecessors connection area on the successors connection area.
Line 89: Line 93:




----
{|width="95%"
{|width="95%"
| || ||align="right"|[[KPlato/Manual/Task Dependency Editor (List)|Next]]
| || ||align="right"|[[KPlato/Manual/Task Dependency Editor (List)|Next]]

Latest revision as of 07:39, 9 September 2010

Under Construction

This is a new page, currently under construction!

Description

The Task Dependency Editor is used to create, edit, and delete task dependencies. For convenience, tasks can also be inserted, deleted or edited.

The tasks are ordered in accordance with the Work Breakdown Structure (WBS).

The symbols for summary tasks, tasks and milestones is shown below:

As the Task and Milestone are sub items to the Summary task, they are indented. Also note that the WBS code is displayed along with the name.

In the following figure a Finish-Start dependency has been inserted to make Milestone depend on Task.


As shown below, an item consists of three different selection areas:

Item area Select the item for editing
Start area Used for creating Finish-Start and Start-Start dependencies
Finish area Used for creating Finish-Start and Finish-Finish dependencies


Editing dependencies

Dependencies are created by first selecting a start- or finish area of the predecessor task, then selecting the start- or finish area of the successor task. This can be done using the mouse or the keyboard.

Alternatively you can drop the predecessors connection area on the successors connection area.


To edit or delete an existing dependency, you can open a dependency by selecting it, or open its context menu.


You can also open the context menu on a connection area which will enable you to edit all dependencies connected to that area.

Toolbar

The toolbar provides the means to create and delete tasks:


Button Short cut Description
Add Task Ctrl+I Drop-down button to create a task or milestone. The new item is positioned after the currently selected item on the same level as the selected item. If no item is selected, the new item is appended at the top level.
Ctrl+Alt+I
Add Sub-task Ctrl+Shift+I Drop-down button to create a sub-task or -milestone. The new item is appended as a child to the currently selected item.
Ctrl+Shift+Alt+I
Delete Task Delete Deletes the selected tasks.



Next
Task Dependency Editor (List)