Difference between revisions of "KPlato/da"

Jump to: navigation, search
(Created page with ''''Styr alle detaljer af dit projekt'''')
 
 
(25 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
|}
 
|}
  
''Features include:''
+
{{Warning|KPlato is now unmaintained since 2012. Users are recommended to switch to the [[Special:myLanguage/Plan|Calligra Plan]] fork.}}
* Multiple views
 
** Gant Charts,
 
** Resource View
 
** Accounts View
 
  
* Uses standard structures
+
== Features ==
** Work breakdown structure (WBS)
 
** Resource breakdown structure (RBS)
 
** Cost breakdown structure (CBS)
 
  
* Configurable level of detail on Gantt Chart
+
* Mange visninger
 +
** Gantt diagrammer
 +
** Resourcevisning
 +
** Kontovisning
  
* Supports Summarytasks, Tasks, and milestones
+
* Bruger standardstrukturer
 +
** Arbejdsfordelingsstruktur (WBS)
 +
** Resourcefordelingsstruktur (RBS)
 +
** Omkostningsanalysestruktur (CBS)
  
* Configurable Scheduling Constraints
+
* Konfigurérbar detaljeringsgrad i Gantt diagrammer
  
* and much more.  Read more details on [http://www.koffice.org/kplato/ the project's home pages]
+
* Understøtter Opgavestatus, Opgaver og Milesten
  
:The KPlato mailing list is at [mailto:[email protected] [email protected]]
+
* Konfugurérbare Skemalægningsbegrænsninger
  
:Subscription information can be found [https://mail.kde.org/mailman/listinfo/koffice here]
+
* og meget mere.  
  
 
+
{|
[[Image:Kplato_accounts.png|thumb|300px|center|Cost Breakdown Structure]]
+
|[[Image:Kplato_tasks.png|thumb|300px|Arbejdsfordelingsstruktur]]|| ||[[Image:Kplato_task_status_report.png|thumb|300px|Opgavestatusrapport]]
 +
|}
  
 
{|
 
{|
|[[Image:Kplato_resource.png|thumb|300px|Resource Breakdown Structure]]|| ||[[Image:Kplato_tasks.png|thumb|300px|Work Breakdown Structure]]
+
|[[Image:Kplato_resource.png|thumb|300px|Resourcefordelingsstruktur]]|| ||[[Image:Kplato_accounts.png|thumb|300px|center|Omkostningsfordelingsstruktur]]||
 
|}
 
|}
  
== Hints, Tips and Tutorials ==
+
==Tips og vejledninger==
  
 +
[[Special:MyLanguage/Plan/Engineering To Order project tutorial|Vejledning: et "Engineering To Order"-projekt]] er en gennemgang af, hvordan man opsætter og udfører et projekt skridt for skridt i '''KPlato'''.
  
[[Category:Office]]
+
[[Category:Kontor/da]]

Latest revision as of 07:17, 15 July 2019

Other languages:
English • ‎dansk • ‎italiano • ‎magyar • ‎українська • ‎日本語
KPlato Gantt view
    Styr alle detaljer af dit projekt
Warning.png
Warning
KPlato is now unmaintained since 2012. Users are recommended to switch to the Calligra Plan fork.


Features

  • Mange visninger
    • Gantt diagrammer
    • Resourcevisning
    • Kontovisning
  • Bruger standardstrukturer
    • Arbejdsfordelingsstruktur (WBS)
    • Resourcefordelingsstruktur (RBS)
    • Omkostningsanalysestruktur (CBS)
  • Konfigurérbar detaljeringsgrad i Gantt diagrammer
  • Understøtter Opgavestatus, Opgaver og Milesten
  • Konfugurérbare Skemalægningsbegrænsninger
  • og meget mere.
Arbejdsfordelingsstruktur
 
Opgavestatusrapport
Resourcefordelingsstruktur
 
Omkostningsfordelingsstruktur

Tips og vejledninger

Vejledning: et "Engineering To Order"-projekt er en gennemgang af, hvordan man opsætter og udfører et projekt skridt for skridt i KPlato.


This page was last edited on 15 July 2019, at 07:17. Content is available under Creative Commons License SA 4.0 unless otherwise noted.