Difference between revisions of "KPlato/da"

Jump to: navigation, search
(Created page with '* Konfigurérbar detaljeringsgrad i Gantt diagrammer')
(Created page with '* Understøtter Opgavestatus, Opgaver og Milesten')
Line 18: Line 18:
 
* Konfigurérbar detaljeringsgrad i Gantt diagrammer
 
* Konfigurérbar detaljeringsgrad i Gantt diagrammer
  
* Supports Summarytasks, Tasks, and milestones
+
* Understøtter Opgavestatus, Opgaver og Milesten
  
 
* Configurable Scheduling Constraints
 
* Configurable Scheduling Constraints

Revision as of 11:53, 25 September 2010

Other languages:
English • ‎dansk • ‎italiano • ‎magyar • ‎українська • ‎日本語
KPlato Gantt view
    Styr alle detaljer af dit projekt

Hovedpunkter

  • Mange visninger
    • Gant diagrammer
    • Resourcevisning
    • Kontovisning
  • Bruger standardstrukturer
    • Arbejdsfordelingsstruktur (WBS)
    • Resourcefordelingsstruktur (RBS)
    • Omkostningsfordelingsstruktur (CBS)
  • Konfigurérbar detaljeringsgrad i Gantt diagrammer
  • Understøtter Opgavestatus, Opgaver og Milesten
  • Configurable Scheduling Constraints
The KPlato mailing list is at [email protected]
Subscription information can be found here


Cost Breakdown Structure
Resource Breakdown Structure
 
Work Breakdown Structure

Hints, Tips and Tutorials


Content is available under Creative Commons License SA 4.0 unless otherwise noted.