KPlato

From KDE UserBase Wiki
Revision as of 09:10, 17 April 2019 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
KPlato Gantt view
    Manage every detail of your project

Warning

KPlato is now unmaintained since 2012. Users are recommended to switch to the Calligra Plan fork.


Features

  • Multiple views
    • Gantt Charts,
    • Resource View
    • Accounts View
  • Uses standard structures
    • Work breakdown structure (WBS)
    • Resource breakdown structure (RBS)
    • Cost breakdown structure (CBS)
  • Configurable level of detail on Gantt Chart
  • Supports Summarytasks, Tasks, and milestones
  • Configurable Scheduling Constraints
  • and much more.
Work Breakdown Structure
 
Task Status Report
Resource Breakdown Structure
 
Cost Breakdown Structure

Hints, Tips and Tutorials

Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project using KPlato.