KPlato

From KDE UserBase Wiki
Revision as of 14:54, 20 August 2011 by DcNdrew (talk | contribs) (Created page with "''Jellemzők:'' * Több nézet ** Gantt diagramok ** Erőforrás nézet ** Számlák nézet")
KPlato Gantt view
    Szerkeszd a projected minden részletét!

Jellemzők:

  • Több nézet
    • Gantt diagramok
    • Erőforrás nézet
    • Számlák nézet
  • Uses standard structures
    • Work breakdown structure (WBS)
    • Resource breakdown structure (RBS)
    • Cost breakdown structure (CBS)
  • Configurable level of detail on Gantt Chart
  • Supports Summarytasks, Tasks, and milestones
  • Configurable Scheduling Constraints
  • and much more.
Work Breakdown Structure
 
Task Status Report
Resource Breakdown Structure
 
Cost Breakdown Structure

Hints, Tips and Tutorials

Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project using KPlato