Plan: Difference between revisions

From KDE UserBase Wiki
(Marked this version for translation)
mNo edit summary
(8 intermediate revisions by 4 users not shown)
Line 57: Line 57:


<!--T:23-->
<!--T:23-->
Plan also comes with a companion; [[PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.
'''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.


== Links == <!--T:18-->
== Hints, Tips and Tutorials == <!--T:25-->
 
<!--T:26-->
* [[Special:myLanguage/Plan/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project.
**  [[Special:myLanguage/Plan/Engineering To Order project tutorial/planning|Engineering To Order project tutorial]]: Planning
**  [[Special:myLanguage/Plan/Engineering To Order project tutorial/executing|Engineering To Order project tutorial]]: Executing and Controlling
 
== More Information == <!--T:18-->


<!--T:24-->
<!--T:24-->
* [[Plan/Manual|The Plan Handbook]]
* [https://docs.kde.org/trunk5/en/calligra/calligraplan/index.html The Plan Handbook]


<!--T:19-->
<!--T:19-->
Line 72: Line 79:
<!--T:21-->
<!--T:21-->
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
== Hints, Tips and Tutorials == <!--T:25-->
<!--T:26-->
This tutorial was made for KPlato but it is still valid for Plan:


<!--T:27-->
<!--T:27-->
[[KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''.
* [https://en.wikipedia.org/wiki/Calligra_Plan Wikipedia]


<!--T:22-->
<!--T:22-->
[[Category:Office]]
[[Category:Office]]
</translate>
</translate>

Revision as of 08:19, 5 August 2020

Manage projects with Plan

Plan is a project management application. It is intended for managing moderately large projects with multiple resources.

Features

  • Different types of task dependencies and timing constraints
  • Scheduling of tasks according to network and resource availability
  • Rescheduling from the current state of the project
  • Comparison with original schedule
Project scheduling and analyzes
  • Flexible entry of task progress
  • Detailed progress report
Task progress information
  • User interface optimized for keyboard entry
  • Customizable views and editors
  • Tasks can be organized in a work breakdown structure
  • Resources can be arranged in a resource breakdown structure
Resource breakdown structure
  • managing of costs in a costs breakdown structure


Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.

Hints, Tips and Tutorials

More Information