Plan: Difference between revisions

    From KDE UserBase Wiki
    No edit summary
    mNo edit summary
    (4 intermediate revisions by 2 users not shown)
    Line 59: Line 59:
    '''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.
    '''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.


    == Links == <!--T:18-->
    == Hints, Tips and Tutorials == <!--T:25-->
     
    <!--T:26-->
    * [[Special:myLanguage/Plan/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project.
    **  [[Special:myLanguage/Plan/Engineering To Order project tutorial/planning|Engineering To Order project tutorial]]: Planning
    **  [[Special:myLanguage/Plan/Engineering To Order project tutorial/executing|Engineering To Order project tutorial]]: Executing and Controlling
     
    == More Information == <!--T:18-->


    <!--T:24-->
    <!--T:24-->
    * [[Special:myLanguage/Plan/Manual|The Plan Handbook]]
    * [https://docs.kde.org/trunk5/en/calligra/calligraplan/index.html The Plan Handbook]


    <!--T:19-->
    <!--T:19-->
    Line 73: Line 80:
    * [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
    * [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]


    == Hints, Tips and Tutorials == <!--T:25-->
    <!--T:27-->
    * [[Special:myLanguage/Plan/Tutorials|Tutorials]]
    * [https://en.wikipedia.org/wiki/Calligra_Plan Wikipedia]
     


    <!--T:22-->
    <!--T:22-->
    [[Category:Office]]
    [[Category:Office]]
    </translate>
    </translate>

    Revision as of 08:19, 5 August 2020

    Manage projects with Plan

    Plan is a project management application. It is intended for managing moderately large projects with multiple resources.

    Features

    • Different types of task dependencies and timing constraints
    • Scheduling of tasks according to network and resource availability
    • Rescheduling from the current state of the project
    • Comparison with original schedule
    Project scheduling and analyzes
    • Flexible entry of task progress
    • Detailed progress report
    Task progress information
    • User interface optimized for keyboard entry
    • Customizable views and editors
    • Tasks can be organized in a work breakdown structure
    • Resources can be arranged in a resource breakdown structure
    Resource breakdown structure
    • managing of costs in a costs breakdown structure


    Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.

    Hints, Tips and Tutorials

    More Information