Plan/Manual/Definitioner

    From KDE UserBase Wiki
    Revision as of 16:00, 16 September 2011 by Claus chr (talk | contribs) (Importing a new version from external source)
    Other languages:

    Introduktion

    I projekthåndtering bruges nogle ord forskelligt i forskellige programmer, organisationer eller projekttyper. I mere udtømmende ordbøger for projekthåndtering vil du finde alternative definitioner for de fleste ord.

    Denne liste definerer, hvordan visse termer bruges i Plan.

    Termer =

    Konto
    En konto bruges i en Struktur for omkostningsanalyse (Cost Breakdown Structure, CBS), hvor omkostninger fra Opgaver eller ressourcer kan samles.

    Allocation
    Tasks are allocated to Resources during the planning stage of the project. The actual assignment is done during scheduling. Note that assignment is not guaranteed as the resource may not be available.

    Assignment
    Tasks are assigned to Resources during scheduling.

    CBS
    Cost Breakdown Structure

    CPI
    Is the Cost Performance Index and is equal to BCWP/ACWP. When this index is below 1, means that you are over budget. If the index is greater than 1 means that the costs are under budget.

    Cost Breakdown structure
    The CBS organizes accounts into a structure to enable cost to be aggregated independent of the WBS and RBS.

    Estimate
    The estimate is the expected amount of effort or time needed to complete a task.

    Milestone
    Todo

    PERT
    Program Evaluation and Review Technique

    Program Evaluation and Review Technique
    TODO

    PERT Distribution
    A simplified way to calculate Expected estimate from Optimistic-, Most Likely- and Pessimistic estimate.

    RBS
    Resource Breakdown Structure

    Resource Breakdown Structure
    The RBS organizes resources into resource groups.

    Resource
    A resource can be of type Work, Material or Team. A resource must always belong to a Resource Group.

    Resource Group
    A resource group is used to group similar resources.

    Resource Team
    A resource team is a resource that consists of a number of other resources.

    SPI
    Is the Schedule Performance Index and is equal to BCWP/BCWS. When this index is below 1, means that you are behind schedule. If the index is greater than 1 means that you are ahead of the schedule.

    Summary Task
    Todo

    Task
    Todo

    vCard
    vCard is a file format standard for electronic business cards.

    WBS
    Work Breakdown Structure

    Work Breakdown Structure
    The WBS is used to break down large projects into manageable chunks to ease planning and management.