;Allocation
;Allocation
:Tasks are allocated to [[#Resource|Resources]] during the planning stage of the project. The actual assigment is done during scheduling. Note that assignment is not guaranteed as the resource may not be available.
:Tasks are allocated to [[#Resource|Resources]] during the planning stage of the project. The actual assignment is done during scheduling. Note that assignment is not guaranteed as the resource may not be available.


<span id="Assignment"></span>
<span id="Assignment"></span>
Line 94: Line 94:
<span id="Work_Breakdown_Structure"></span>
<span id="Work_Breakdown_Structure"></span>
;Work Breakdown Structure
;Work Breakdown Structure
:The WBS is used to break down large projects into manageable chuncks to ease planning and management.
:The WBS is used to break down large projects into manageable chunks to ease planning and management.


{|width="95%"
{|width="95%"

Revision as of 13:39, 16 September 2011

Other languages:

Вступ

У керуванні проектами різні терміни можуть використовуватися у різних програмах, різних компаніях або різних типах проектів для позначення однакових понять. У повніших глосаріях термінів керування проектами можна знайти різні визначення для більшості термінів.

За допомогою наведено нижче списку ви можете познайомитися з термінологією Plan.

Терміни

Account
An account is used in a Cost Breakdown Structure (CBS) to represent a place where cost from tasks or resources can be aggregated.

Allocation
Tasks are allocated to Resources during the planning stage of the project. The actual assignment is done during scheduling. Note that assignment is not guaranteed as the resource may not be available.

Assignment
Tasks are assigned to Resources during scheduling.

CBS
Cost Breakdown Structure

CPI
Is the Cost Performance Index and is equal to BCWP/ACWP. When this index is below 1, means that you are over budget. If the index is greater than 1 means that the costs are under budget.

Cost Breakdown structure
The CBS organizes accounts into a structure to enable cost to be aggregated independent of the WBS and RBS.

Estimate
The estimate is the expected amount of effort or time needed to complete a task.

Milestone
Todo

PERT
Program Evaluation and Review Technique

Program Evaluation and Review Technique
TODO

PERT Distribution
A simplified way to calculate Expected estimate from Optimistic-, Most Likely- and Pessimistic estimate.

RBS
Resource Breakdown Structure

Resource Breakdown Structure
The RBS organizes resources into resource groups.

Resource
A resource can be of type Work, Material or Team. A resource must always belong to a Resource Group.

Resource Group
A resource group is used to group similar resources.

Resource Team
A resource team is a resource that consists of a number of other resources.

SPI
Is the Schedule Performance Index and is equal to BCWP/BCWS. When this index is below 1, means that you are behind schedule. If the index is greater than 1 means that you are ahead of the schedule.

Summary Task
Todo

Task
Todo

vCard
vCard is a file format standard for electronic business cards.

WBS
Work Breakdown Structure

Work Breakdown Structure
The WBS is used to break down large projects into manageable chunks to ease planning and management.