Plan/Manual/Introduction

Revision as of 10:39, 1 November 2019 by Yurchor (talk | contribs) (Fix minor typos)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
Other languages:
English • ‎dansk • ‎українська

Introduction

Features include:

  • Task management using the Task Editor
    • Work breakdown structure with configurable WBS codes
    • Tasks, summary tasks, and milestones
    • Different types of time constraints
    • Different types of dependencies.
  • Resource management using the Resource Editor
    • Resource breakdown structure
    • Working- and material resource types
    • Resource allocation on group level
    • Resource teams
  • Earned value management
  • Project scheduling using the Schedules Editor
    • Schedule forward from start time or backward from finish time
    • Allow or avoid resource overbooking
    • PERT distribution with optimistic-, pessimistic-, and most likely estimates
    • Multiple schedules with a possibility to schedule from current progress information


This page was last edited on 1 November 2019, at 10:39. Content is available under Creative Commons License SA 4.0 unless otherwise noted.