Plan/Manual/Milestone Gantt View: Difference between revisions

    From KDE UserBase Wiki
    m (Fix formatting)
    m (Fix formatting)
     
    (No difference)

    Latest revision as of 14:11, 1 November 2019

    Under Construction

    This is a new page, currently under construction!

    Milestone Gantt View

    Description

    The Milestone Gantt view is used to show milestones in a time line.
    File:Plan milestoneganttview.png
    Gantt View

    Editing data

    Milestone description and progress can be edited using the context menu.

    The following columns are displayed as default:

    Column Description
    WBS Code The Work Breakdown Structure code
    Name The name of the milestone.
    Start Time The scheduled start time.

    Configuration

    Using the context menu, the view can be configured to split/unsplit the tree view or it can be configured using the configure dialog.

    The configure dialog enables you to tailor the amount of information the view displays to fit your needs.

    File:Plan milestoneganttview config.png
    Configuration Dialog