Difference between revisions of "Plan/pt-br"

Jump to: navigation, search
(Created page with "* Comparação com o cronograma original")
(Updating to match new version of source page)
 
(19 intermediate revisions by 2 users not shown)
Line 17: Line 17:
 
* Comparação com o cronograma original
 
* Comparação com o cronograma original
  
[[Image:Scheduleeditor1-500x383.png|thumb|center|500px|Project scheduling and analyzes]]
+
[[Image:Scheduleeditor1-500x383.png|thumb|center|500px|analisando e cronometrando projetos]]
  
* Flexible entry of task progress
+
* Edição de progresso de tarefas flexível
  
* Detailed progress report
+
* Relatório de progresso detalhado
  
[[Image:Taskexecution1-500x383.png|thumb|center|500px|Task progress information]]
+
[[Image:Taskexecution1-500x383.png|thumb|center|500px|Informação de progresso de tarefas]]
  
* User interface optimized for keyboard entry
+
* Interface de usuário otimizada para entrada de teclado
  
* Customizable views and editors
+
* Editores e visualizadores customizáveis
  
* Tasks can be organized in a work breakdown structure
+
* Tarefas podem ser organizadas em uma estrutura de divisão de trabalho (estrutura WBS)
  
* Resources can be arranged in a resource breakdown structure
+
* Recursos podem ser organizados em uma estrutura de divisão de trabalho (estrutura WBS)
  
[[Image:Resourceeditor1-500x383.png|thumb|center|500px|Resource breakdown structure]]
+
[[Image:Resourceeditor1-500x383.png|thumb|center|500px|Estrutura de Divisão de Trabalho (estrutura WBS)]]
  
* managing of costs in a costs breakdown structure
+
* Gerenciamento de custos na Estrutura de Divisão de Trabalho (estrutura WBS)
  
  
'''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.
+
'''Plan''' também vem com um companheiro; [[Special:myLanguage/PlanWork|PlanWork]] que é desenhado para auxiliar o fluxo de trabalho e informação durante a execução do projeto.
  
== Links ==
+
== Hints, Tips and Tutorials ==
  
* [[Special:myLanguage/Plan/Manual|The Plan Handbook]]
+
Este tutorial foi feito para o '''KPlato''' mas ainda é valido para o '''Plan''':
  
* [http://www.calligra.org/plan/ The home page of Plan]
+
== Links (Referências)==
  
* [http://www.calligra.org Home of the Calligra project]
+
* [[Special:myLanguage/Plan/Manual|Manual do Plan (em inglês)]]
  
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
+
* [http://www.calligra.org/plan/ Página oficial do Plan]
  
== Hints, Tips and Tutorials ==
+
* [http://www.calligra.org Página Inicial do projeto Calligra]
  
This tutorial was made for '''KPlato''' but it is still valid for '''Plan''':
+
* [http://forum.kde.org/viewforum.php?f=203 Fórum do Calligra]
  
[[Special:myLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''.
+
* [https://en.wikipedia.org/wiki/Calligra_Plan Wikipedia]
  
 
[[Category:Office]]
 
[[Category:Office]]

Latest revision as of 09:10, 17 April 2019

Other languages:
English • ‎dansk • ‎español • ‎italiano • ‎português do Brasil • ‎українська
Gantt2-500x383.png Gerencie projetos com o Plan

Plan é uma ferramenta de gerenciamento de projetos. Seu objetivo é gerenciar projetos relativamente grandes e com muitos recursos.

Recursos

  • Diferentes tipos de dependências de tarefas e condensadores de tempo
  • Agendamento de tarefas de acordo com grupos de trabalho e disponibilidade de recursos
  • Reavaliação do estado atual do projeto
  • Comparação com o cronograma original
analisando e cronometrando projetos
  • Edição de progresso de tarefas flexível
  • Relatório de progresso detalhado
Informação de progresso de tarefas
  • Interface de usuário otimizada para entrada de teclado
  • Editores e visualizadores customizáveis
  • Tarefas podem ser organizadas em uma estrutura de divisão de trabalho (estrutura WBS)
  • Recursos podem ser organizados em uma estrutura de divisão de trabalho (estrutura WBS)
Estrutura de Divisão de Trabalho (estrutura WBS)
  • Gerenciamento de custos na Estrutura de Divisão de Trabalho (estrutura WBS)


Plan também vem com um companheiro; PlanWork que é desenhado para auxiliar o fluxo de trabalho e informação durante a execução do projeto.

Hints, Tips and Tutorials

Este tutorial foi feito para o KPlato mas ainda é valido para o Plan:

Links (Referências)


This page was last edited on 17 April 2019, at 09:10. Content is available under Creative Commons License SA 4.0 unless otherwise noted.