Translations:KPlato/Engineering To Order project tutorial/3/en

From KDE UserBase Wiki
Revision as of 08:00, 11 April 2019 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

There are two main phases, the first is related to the planning while the second is related to the executing and controlling.