Revision as of 08:00, 11 April 2019 by FuzzyBot (talk | contribs) (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/3/it to Translations:Plan/Engineering To Order project tutorial/3/it without leaving a redirect: Part of translatable page "KPlato/Engineering To Order project tutori...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Ci sono due fasi principali, la prima è relativa alla pianificazione mentre la seconda è legata all'esecuzione e al controllo.