Revision as of 08:40, 11 April 2019 by FuzzyBot (talk | contribs) (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/executing/12/da to Translations:Plan/Engineering To Order project tutorial/executing/12/da without leaving a redirect: Part of translatable page "KPlato/Engineering T...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Her betyder BCWS "Budgeted Cost Work Scheduled", BCWP betyder "Budgeted Cost Work Performed", ACWP betyder "Actual Cost Work Performed". Alle disse betragtes både som indsats og som omkostning. PI betyder "Performance Index", CPI betyder "Cost Performance Index" og SPI betyder "Schedule Performance Index".