Translations:Plan/Engineering To Order project tutorial/executing/60/da

Revision as of 08:40, 11 April 2019 by FuzzyBot (talk | contribs) (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/executing/60/da to Translations:Plan/Engineering To Order project tutorial/executing/60/da without leaving a redirect: Part of translatable page "KPlato/Engineering T...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Den samlede forventede sum for hver af projektets opgaver vises i feltet til venstre i søjlen I alt mellem kantede parenteser, mens de aktuelle samlede udgifter står foran de kantede parenteser.


This page was last edited on 11 April 2019, at 08:40. Content is available under Creative Commons License SA 4.0 unless otherwise noted.