Translations:Plan/Engineering To Order project tutorial/planning/112/da

From KDE UserBase Wiki
Revision as of 08:00, 11 April 2019 by FuzzyBot (talk | contribs) (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/planning/112/da to Translations:Plan/Engineering To Order project tutorial/planning/112/da without leaving a redirect: Part of translatable page "KPlato/Engineering T...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Hvis fordelingen er sat til 'Ingen', så bruges opgavens estimat som det er under skemalægningen. Hvis fordelingen er sat til 'PERT', så beregnes det anvendte estimat (E) ud fra de angivne optimistiske (O), pessimistiske (P) og mest sandsynlige (M) estimat. Den anvendte formel er: