Revision as of 08:00, 11 April 2019 by FuzzyBot (talk | contribs) (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/planning/67/da to Translations:Plan/Engineering To Order project tutorial/planning/67/da without leaving a redirect: Part of translatable page "KPlato/Engineering To...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

En opgaves kalender har forrang for en ressources kalender. En ressources tilgængelighedsdata afhænger hovedsaligt af, om ressourcen kun er tilgængelig i en begrænset perode. I dette tilfælde må vi sikre os, at alle ressourcer er tilgængelige fra arbejdets begyndelse til dets afslutning.