Translations:Plan/Engineering To Order project tutorial/planning/80/it

From KDE UserBase Wiki
Revision as of 08:00, 11 April 2019 by FuzzyBot (talk | contribs) (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/planning/80/it to Translations:Plan/Engineering To Order project tutorial/planning/80/it without leaving a redirect: Part of translatable page "KPlato/Engineering To...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Il livello di rischio così come i tempi ottimistici e pessimistici modificheranno il calcolo del progetto totale considerando la tecnica PERT. In questo caso -5% e 20% sono i valori e il rischio è considerato "Alto".