Plan/es: Difference between revisions

From KDE UserBase Wiki
(Updating to match new version of source page)
(Updating to match new version of source page)
 
(2 intermediate revisions by the same user not shown)
Line 40: Line 40:
'''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.
'''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.


== Links ==
== Hints, Tips and Tutorials ==


* [[Special:myLanguage/Plan/Manual|The Plan Handbook]]
* [[Special:myLanguage/Plan/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project.
**  [[Special:myLanguage/Plan/Engineering To Order project tutorial/planning|Engineering To Order project tutorial]]: Planning
**  [[Special:myLanguage/Plan/Engineering To Order project tutorial/executing|Engineering To Order project tutorial]]: Executing and Controlling
 
== More Information ==
 
* [https://docs.kde.org/trunk5/en/calligraplan/calligraplan/index.html The Plan Handbook]


* [http://www.calligra.org/plan/ The home page of Plan]
* [http://www.calligra.org/plan/ The home page of Plan]
Line 50: Line 56:
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]


== Hints, Tips and Tutorials ==
* [https://en.wikipedia.org/wiki/Calligra_Plan Wikipedia]
* [[Special:myLanguage/Plan/Tutorials|Tutorials]]
 


[[Category:Office]]
[[Category:Office]]

Latest revision as of 17:39, 31 May 2021

Gestione proyectos con Plan

Plan es una aplicación de gestión de proyectos. Está destinada para gestionar proyectos moderadamente grandes con múltiples recursos.

Características

  • Different types of task dependencies and timing constraints
  • Scheduling of tasks according to network and resource availability
  • Rescheduling from the current state of the project
  • Comparison with original schedule
Project scheduling and analyzes
  • Flexible entry of task progress
  • Detailed progress report
Task progress information
  • User interface optimized for keyboard entry
  • Customizable views and editors
  • Tasks can be organized in a work breakdown structure
  • Resources can be arranged in a resource breakdown structure
Resource breakdown structure
  • managing of costs in a costs breakdown structure


Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.