Plan/en: Difference between revisions

From KDE UserBase Wiki
(Updating to match new version of source page)
(Updating to match new version of source page)
Line 36: Line 36:


* managing of costs in a costs breakdown structure
* managing of costs in a costs breakdown structure
Plan also comes with a companion; [[PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.


== Links ==
== Links ==
* [[Plan/Manual|The Plan Handbook]]


* [http://www.calligra.org/plan/ The home page of Plan]
* [http://www.calligra.org/plan/ The home page of Plan]
Line 44: Line 49:


* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
== Hints, Tips and Tutorials ==
This tutorial was made for KPlato but it is still valid for Plan:
[[KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''.


[[Category:Office]]
[[Category:Office]]

Revision as of 15:47, 14 December 2011

Manage projects with Plan

Plan is a project management application. It is intended for managing moderately large projects with multiple resources.

Features

  • Different types of task dependencies and timing constraints
  • Scheduling of tasks according to network and resource availability
  • Rescheduling from the current state of the project
  • Comparison with original schedule
Project scheduling and analyzes
  • Flexible entry of task progress
  • Detailed progress report
Task progress information
  • User interface optimized for keyboard entry
  • Customizable views and editors
  • Tasks can be organized in a work breakdown structure
  • Resources can be arranged in a resource breakdown structure
Resource breakdown structure
  • managing of costs in a costs breakdown structure


Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.

Links

Hints, Tips and Tutorials

This tutorial was made for KPlato but it is still valid for Plan:

Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project using KPlato.