Plan/en: Difference between revisions
(Updating to match new version of source page) |
(Updating to match new version of source page) |
||
Line 38: | Line 38: | ||
Plan also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project. | '''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project. | ||
== Links == | == Links == | ||
Line 52: | Line 52: | ||
== Hints, Tips and Tutorials == | == Hints, Tips and Tutorials == | ||
This tutorial was made for KPlato but it is still valid for Plan: | This tutorial was made for '''KPlato''' but it is still valid for '''Plan''': | ||
[[Special:myLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''. | [[Special:myLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''. | ||
[[Category:Office]] | [[Category:Office]] |
Revision as of 19:10, 24 December 2011
Manage projects with Plan |
Plan is a project management application. It is intended for managing moderately large projects with multiple resources.
Features
- Different types of task dependencies and timing constraints
- Scheduling of tasks according to network and resource availability
- Rescheduling from the current state of the project
- Comparison with original schedule
- Flexible entry of task progress
- Detailed progress report
- User interface optimized for keyboard entry
- Customizable views and editors
- Tasks can be organized in a work breakdown structure
- Resources can be arranged in a resource breakdown structure
- managing of costs in a costs breakdown structure
Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.
Links
Hints, Tips and Tutorials
This tutorial was made for KPlato but it is still valid for Plan:
Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project using KPlato.