KPlato/it: Difference between revisions

From KDE UserBase Wiki
(Created page with ""Le caratteristiche includono:" * Viste multiple ** Diagrammi di Gantt ** Vista risorse ** Vista Centro di costo")
(Created page with "* Utilizzo di strutture standard ** Work breakdown structure (WBS) ** Resource breakdown structure (RBS) ** Cost breakdown structure (CBS)")
Line 11: Line 11:
** Vista Centro di costo
** Vista Centro di costo


* Uses standard structures
* Utilizzo di strutture standard
** Work breakdown structure (WBS)
** Work breakdown structure (WBS)
** Resource breakdown structure (RBS)
** Resource breakdown structure (RBS)

Revision as of 15:23, 17 October 2010

KPlato Gantt view
    "Gestisci ogni dettaglio del tuo progetto"

"Le caratteristiche includono:"

  • Viste multiple
    • Diagrammi di Gantt
    • Vista risorse
    • Vista Centro di costo
  • Utilizzo di strutture standard
    • Work breakdown structure (WBS)
    • Resource breakdown structure (RBS)
    • Cost breakdown structure (CBS)
  • Configurable level of detail on Gantt Chart
  • Supports Summarytasks, Tasks, and milestones
  • Configurable Scheduling Constraints
The KPlato mailing list is at [email protected]
Subscription information can be found here


Cost Breakdown Structure
Resource Breakdown Structure
 
Work Breakdown Structure

Hints, Tips and Tutorials