Difference between revisions of "Plan/Manual/Introduction"

Jump to: navigation, search
m (Fix next/prev)
m
(One intermediate revision by the same user not shown)
Line 37: Line 37:
 
:* Task tracking using the [[Special:myLanguage/Plan/Manual/Task Execution View|Task Execution View]] or [[Special:myLanguage/Plan/Manual/Task Status View|Task Status View]]
 
:* Task tracking using the [[Special:myLanguage/Plan/Manual/Task Execution View|Task Execution View]] or [[Special:myLanguage/Plan/Manual/Task Status View|Task Status View]]
  
{{Plan/Prevnext|prevpage=Import and Export|indextext=Contents|nextpage=Definitions}}
+
----
 +
{{Plan/Prevnext|prevpage=|indextext=Contents|nextpage=Definitions}}
  
 
<!--T:9-->
 
<!--T:9-->
 
[[Category:Office]]
 
[[Category:Office]]
 
</translate>
 
</translate>

Revision as of 07:50, 10 October 2019

Other languages:
English • ‎dansk • ‎українська

Introduction

Features includes:

  • Task management using the Task Editor
    • Work breakdown structure with configurable wbs codes
    • Tasks, summary tasks and milestones
    • Different types of time constraints
    • Different types of dependencies.
  • Resource management using the Resource Editor
    • Resource breakdown structure
    • Working- and material resource types
    • Resource allocation on group level
    • Resource teams
  • Earned value management
  • Project scheduling using the Schedules Editor
    • Schedule forward from start time or backwards from finish time
    • Allow or avoid resource overbooking
    • PERT distribution with optimistic-, pessimistic-, and most likely estimates
    • Multiple schedules with possibility to schedule from current progress information