Translations:Plan/Engineering To Order project tutorial/planning/77/da: Difference between revisions

From KDE UserBase Wiki
(Importing a new version from external source)
m (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/planning/77/da to Translations:Plan/Engineering To Order project tutorial/planning/77/da without leaving a redirect: Part of translatable page "KPlato/Engineering To...)
 
(No difference)

Latest revision as of 08:00, 11 April 2019

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Plan/Engineering To Order project tutorial/planning)
On the General tab insert the name of the task, you can choose a responsible person if needed, then define the timing and the risk associated to the task. The schedule type is typical for planning, "as soon as possible" is the most used. Other kind of type, generate a need to compile the date and time on the right of the drop-down menu.

I fanebladet Generelt indsættes opgavens navn. Du kan vælge en ansvarlig, hvis det er nødvendigt og så definere timingen og risikoen, som er forbundet med opgaven. Skematypen bruges typisk ved planlægning; "Så hurtigt som muligt" er den mest anvendte. Ved nogle af de andre typer skal der angives en dato og tid i felterne til højre for typen.