Plan: Difference between revisions
Appearance
Marked this version for translation |
fix wrong link to handbook on docs.kde.org |
||
(9 intermediate revisions by 4 users not shown) | |||
Line 57: | Line 57: | ||
<!--T:23--> | <!--T:23--> | ||
Plan also comes with a companion; [[PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project. | '''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project. | ||
== | == Hints, Tips and Tutorials == <!--T:25--> | ||
<!--T:26--> | |||
* [[Special:myLanguage/Plan/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project. | |||
** [[Special:myLanguage/Plan/Engineering To Order project tutorial/planning|Engineering To Order project tutorial]]: Planning | |||
** [[Special:myLanguage/Plan/Engineering To Order project tutorial/executing|Engineering To Order project tutorial]]: Executing and Controlling | |||
== More Information == <!--T:18--> | |||
<!--T:24--> | <!--T:24--> | ||
* [ | * [https://docs.kde.org/trunk5/en/calligraplan/calligraplan/index.html The Plan Handbook] | ||
<!--T:19--> | <!--T:19--> | ||
Line 72: | Line 79: | ||
<!--T:21--> | <!--T:21--> | ||
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum] | * [http://forum.kde.org/viewforum.php?f=203 The Calligra forum] | ||
<!--T:27--> | <!--T:27--> | ||
[ | * [https://en.wikipedia.org/wiki/Calligra_Plan Wikipedia] | ||
<!--T:22--> | <!--T:22--> | ||
[[Category:Office]] | [[Category:Office]] | ||
</translate> | </translate> |
Latest revision as of 10:14, 21 April 2021
![]() |
Manage projects with Plan |
Plan is a project management application. It is intended for managing moderately large projects with multiple resources.
Features
- Different types of task dependencies and timing constraints
- Scheduling of tasks according to network and resource availability
- Rescheduling from the current state of the project
- Comparison with original schedule

- Flexible entry of task progress
- Detailed progress report

- User interface optimized for keyboard entry
- Customizable views and editors
- Tasks can be organized in a work breakdown structure
- Resources can be arranged in a resource breakdown structure

- managing of costs in a costs breakdown structure
Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.
Hints, Tips and Tutorials
- Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project.
- Engineering To Order project tutorial: Planning
- Engineering To Order project tutorial: Executing and Controlling