KPlato/Manual/Resource Editor: Difference between revisions
m (Link fixed) |
mNo edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Construction}} | {{Construction}} | ||
==Description== | ==Description== | ||
The Resource Editor is used to create, edit, and delete resources and resource groups. Resources must belong to resource group. At the moment sub-groups are not allowed. | {| | ||
| The Resource Editor is used to create, edit, and delete resources and resource groups. Resources must belong to a resource group. At the moment sub-groups are not allowed. | |||
|[[Image:Kplato_resourceeditor.png|350px]] | |||
|} | |||
Working resources must refere to a ''calendar'' that defines the working hours for the resource. Calendars are created using the [[KPlato/Manual/Work and Vacation Editor|Work and Vacation Editor]]. | Working resources must refere to a ''calendar'' that defines the working hours for the resource. Calendars are created using the [[KPlato/Manual/Work and Vacation Editor|Work and Vacation Editor]]. | ||
Line 7: | Line 10: | ||
Material resources is by default always available. You can use a calendar to limit its availability. | Material resources is by default always available. You can use a calendar to limit its availability. | ||
==Toolbar== | |||
The toolbar provides the means to create and delete resources and resource groups: | The toolbar provides the means to create and delete resources and resource groups: | ||
{|style="text-align:center" | {|style="text-align:center" | ||
Line 26: | Line 30: | ||
| Button to create a resource. The new resource is appended as a child to the currently selected group. If a resource is selected, the new resource is appended to its parent group. | | Button to create a resource. The new resource is appended as a child to the currently selected group. If a resource is selected, the new resource is appended to its parent group. | ||
|- | |- | ||
| Delete | | Delete || <keycap>Delete</keycap> || Deletes the selected resources and/or resource groups. | ||
|} | |} | ||
Resources can be created by | Resources can be created by dropping data from any application that supports dragging [[KPlato/Manual/Definitions#vCard|vCard]] information, like ''KAddressBook'' or ''Evolution''. | ||
Resources can be copied or moved to a different resource group using drag-and-drop. | Resources can be copied or moved to a different resource group using drag-and-drop. | ||
{{Note|When moving a resource, the resource will loose any allocations.}} | {{Note|When moving a resource, the resource will loose any allocations.}} | ||
=Editing data= | ==Editing data== | ||
Data can be edited inline as described [[KPlato Manual/Using the Views|here]]. | Data can be edited inline as described [[KPlato/Manual/Using the Views|here]]. | ||
Resources can also be edited using the [[KPlato Manual/Resource Settings Dialog|resource settings dialog]]. | Resources can also be edited using the [[KPlato/Manual/Resource Settings Dialog|resource settings dialog]]. | ||
The following columns are displayed as default: | The following columns are displayed as default: | ||
=Configuration= | {| border="1" cellpadding="5" cellspacing="0" | ||
Using the context menu, the view can be configured to split/unsplit the tree view or it can be configured using the configure dialog. | | style="background:#efefef;" | '''Column''' | ||
| style="background:#efefef;" | '''Description''' | |||
|- | |||
| Name | |||
| The name of the resource or resource group. | |||
|- | |||
| Type | |||
| The type of the resource or resource group. | |||
|- | |||
| Initials | |||
| The initials of the resource. | |||
|- | |||
| Email | |||
| The e-mail address of the resource. | |||
|- | |||
| Calendar | |||
| The calendar defines when the resource is working. | |||
|- | |||
| Limit (%) | |||
| The maximum load that can be assigned. | |||
|- | |||
| Available From | |||
| Defines when the resource is available to the project. | |||
|- | |||
| Available Until | |||
| Defines when the resource is available to the project. | |||
|- | |||
| Normal Rate | |||
| The cost pr hour, normal hours. | |||
|- | |||
| Account | |||
| The account where the resource cost is accumulated. | |||
|} | |||
==Configuration== | |||
{| | |||
| Using the context menu, the view can be configured to split/unsplit the tree view or it can be configured using the configure dialog. | |||
The configure dialog enables you to tailor the amount of information the view displays to fit your needs. | The configure dialog enables you to tailor the amount of information the view displays to fit your needs. | ||
|[[Image:Kplato_resourceeditor_config.png|350px]] | |||
|} | |||
---- | |||
{| | {| | ||
|width="70%"| | |width="70%"| |
Latest revision as of 07:51, 9 September 2010
Description
The Resource Editor is used to create, edit, and delete resources and resource groups. Resources must belong to a resource group. At the moment sub-groups are not allowed. |
Working resources must refere to a calendar that defines the working hours for the resource. Calendars are created using the Work and Vacation Editor.
Material resources is by default always available. You can use a calendar to limit its availability.
Toolbar
The toolbar provides the means to create and delete resources and resource groups:
Button | Short cut | Description |
Add Resource Group | Ctrl+I | Button to create a resource group. The new group is appended at the end of the groups. |
Add Resource | Ctrl+Shift+I | Button to create a resource. The new resource is appended as a child to the currently selected group. If a resource is selected, the new resource is appended to its parent group. |
Delete | Delete | Deletes the selected resources and/or resource groups. |
Resources can be created by dropping data from any application that supports dragging vCard information, like KAddressBook or Evolution.
Resources can be copied or moved to a different resource group using drag-and-drop.
Editing data
Data can be edited inline as described here. Resources can also be edited using the resource settings dialog.
The following columns are displayed as default:
Column | Description |
Name | The name of the resource or resource group. |
Type | The type of the resource or resource group. |
Initials | The initials of the resource. |
The e-mail address of the resource. | |
Calendar | The calendar defines when the resource is working. |
Limit (%) | The maximum load that can be assigned. |
Available From | Defines when the resource is available to the project. |
Available Until | Defines when the resource is available to the project. |
Normal Rate | The cost pr hour, normal hours. |
Account | The account where the resource cost is accumulated. |
Configuration
Next | |
Work and Vacation Editor |