KPlato/Manual/Resource Editor

From KDE UserBase Wiki
Revision as of 06:31, 8 September 2010 by Dag (talk | contribs) (Add images, describe data)

Under Construction

This is a new page, currently under construction!

Description

The Resource Editor is used to create, edit, and delete resources and resource groups. Resources must belong to a resource group. At the moment sub-groups are not allowed.

Working resources must refere to a calendar that defines the working hours for the resource. Calendars are created using the Work and Vacation Editor.

Material resources is by default always available. You can use a calendar to limit its availability.

Toolbar

The toolbar provides the means to create and delete resources and resource groups:


Button Short cut Description
Add Resource Group Ctrl+I Button to create a resource group. The new group is appended at the end of the groups.
Add Resource Ctrl+Shift+I Button to create a resource. The new resource is appended as a child to the currently selected group. If a resource is selected, the new resource is appended to its parent group.
Delete Delete Deletes the selected resources and/or resource groups.


Resources can be created by dropping data from any application that supports dragging vCard information, like KAddressBook or Evolution.

Resources can be copied or moved to a different resource group using drag-and-drop.

Note

When moving a resource, the resource will loose any allocations.


Editing data

Data can be edited inline as described here. Resources can also be edited using the resource settings dialog.

The following columns are displayed as default:

Column Description
Name The name of the resource or resource group.
Type The type of the resource or resource group.
Initials The initials of the resource.
Email The e-mail address of the resource.
Calendar The calendar defines when the resource is working.
Limit (%) The maximum load that can be assigned.
Available From Defines when the resource is available to the project.
Available Until Defines when the resource is available to the project.
Normal Rate The cost pr hour, normal hours.
Account The name of the account.

Configuration

Using the context menu, the view can be configured to split/unsplit the tree view or it can be configured using the configure dialog.

The configure dialog enables you to tailor the amount of information the view displays to fit your needs.

Next
Work and Vacation Editor