Plan/Manual/Introduction

From KDE UserBase Wiki
Revision as of 14:29, 6 September 2020 by FuzzyBot (talk | contribs) (Updating to match new version of source page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Introduction

Features include:

  • Task management using the Task Editor
    • Work breakdown structure with configurable WBS codes
    • Tasks, summary tasks, and milestones
    • Different types of time constraints
    • Different types of dependencies.
  • Resource management using the Resource Editor
    • Resource breakdown structure
    • Working- and material resource types
    • Resource allocation on group level
    • Resource teams
  • Earned value management
  • Project scheduling using the Schedules Editor
    • Schedule forward from start time or backward from finish time
    • Allow or avoid resource overbooking
    • PERT distribution with optimistic-, pessimistic-, and most likely estimates
    • Multiple schedules with a possibility to schedule from current progress information