KPlato: Difference between revisions

From KDE UserBase Wiki
m (fix formating)
(Marked this version for translation)
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<languages />
<languages />
<translate>
<!--T:15-->
{{Historic}}


{|class="tablecenter vertical-centered"
</translate>{|class="tablecenter vertical-centered"
|[[Image:Kplato_gantt.png|thumb|250px|KPlato Gantt view]]||&nbsp;||&nbsp;||<translate><!--T:1-->
|[[Image:Kplato_gantt.png|thumb|250px|KPlato Gantt view]]||&nbsp;||&nbsp;||<translate><!--T:1-->
'''Manage every detail of your project'''</translate>
'''Manage every detail of your project'''</translate>
|}
|}


{{Warning|KPlato is now unmaintained since 2012. Users are recommended to switch to the [[Special:myLanguage/Plan|Calligra Plan]] fork.}}
<translate>== Features == <!--T:16-->
 
== Features ==


<translate>
<!--T:2-->
<!--T:2-->
* Multiple views
* Multiple views
Line 48: Line 49:


<!--T:14-->
<!--T:14-->
[[Special:MyLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''
[[Special:MyLanguage/Plan/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''.


<!--T:13-->
<!--T:13-->
[[Category:Office]]
[[Category:Office]]
</translate>
</translate>

Latest revision as of 09:41, 13 April 2024

Historic page

This page is of historic interest only. The content of the page is obsolete.
KPlato Gantt view
    Manage every detail of your project

Features

  • Multiple views
    • Gantt Charts,
    • Resource View
    • Accounts View
  • Uses standard structures
    • Work breakdown structure (WBS)
    • Resource breakdown structure (RBS)
    • Cost breakdown structure (CBS)
  • Configurable level of detail on Gantt Chart
  • Supports Summarytasks, Tasks, and milestones
  • Configurable Scheduling Constraints
  • and much more.
Work Breakdown Structure
 
Task Status Report
Resource Breakdown Structure
 
Cost Breakdown Structure

Hints, Tips and Tutorials

Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project using KPlato.