Difference between revisions of "Plan/Manual/Introduction"

m (Fix minor typos)
(Add nexttext to help translators)
 
Line 39: Line 39:
 
<!--T:10-->
 
<!--T:10-->
 
----
 
----
{{Plan/Prevnext|prevpage=|indextext=Contents|nextpage=Definitions}}
+
{{Plan/Prevnext|prevpage=|indextext=Contents|nextpage=Definitions|nexttext=Definitions}}
  
 
<!--T:9-->
 
<!--T:9-->
 
[[Category:Office]]
 
[[Category:Office]]
 
</translate>
 
</translate>

Latest revision as of 09:51, 7 April 2020

Other languages:
English • ‎dansk • ‎українська

Introduction

Features include:

  • Task management using the Task Editor
    • Work breakdown structure with configurable WBS codes
    • Tasks, summary tasks, and milestones
    • Different types of time constraints
    • Different types of dependencies.
  • Resource management using the Resource Editor
    • Resource breakdown structure
    • Working- and material resource types
    • Resource allocation on group level
    • Resource teams
  • Earned value management
  • Project scheduling using the Schedules Editor
    • Schedule forward from start time or backward from finish time
    • Allow or avoid resource overbooking
    • PERT distribution with optimistic-, pessimistic-, and most likely estimates
    • Multiple schedules with a possibility to schedule from current progress information


This page was last edited on 7 April 2020, at 09:51. Content is available under Creative Commons License SA 4.0 unless otherwise noted.