Plan/Manual/Schedules Editor: Difference between revisions
Created page with "{{Construction}} ==Description== {| | The Schedule Editor is used to create, edit, calculate and delete schedules. |350px |} The Schedule Edit..." |
mNo edit summary |
||
Line 1: | Line 1: | ||
==Description== | ==Description== | ||
{| | {| |
Revision as of 12:48, 15 August 2011
Description
The Schedule Editor is used to create, edit, calculate and delete schedules. |
The Schedule Editor has three sub-views the shows the results of the scheduling.
The Result sub-view shows the values needed for PERT analysis including early start and -finish, late start and -finish along with different types of float.
The Critical Path sub-view shows the tasks that belongs to the critical path.
The Scheduling Log sub-view shows a list of messages produced during scheduling.
Toolbar
The toolbar provides the means to create, delete and calculate schedules:
Button | Short cut | Description |
Add Schedule | Ctrl+I | Button to create a resource group. The new group is appended at the end of the groups. |
Add Subschedule | Ctrl+Shift+I | Button to create a sub-schedule. The new schedule is appended as a child to the currently selected schedule. |
Delete | Delete | Deletes the selected schedule. |
Calculate | Calculates the selected schedule. | |
Baseline | Baselines the selected schedule. Prevents the schedule from being re-calculated or deleted. |
Editing data
Data can be edited in-line as described here.
The following columns are displayed as default:
Column | Description |
Name | The name of the schedule. |
State | The schedules state. Shows a progress bar during scheduling. |
Direction | The scheduling direction.
If direction is Forward, the project is scheduled starting at the projects earliest start time specified in the main project dialog. If direction is Backward, the project is scheduled starting at the projects latest finish time specified in the main project dialog." |
Overbooking | Controls resource overbooking when scheduling.
If overbooking is allowed, a resource may be booked (on working days) to work more than it is available. This can happen if the resource is allocated to multiple tasks or are booked on other projects. If overbooking is to be avoided, resources will not be booked more than they are available. On resource conflict, tasks will be delayed until the resource is available. |
Distribution | The distribution to be used during scheduling.
If distribution is 'None', the tasks estimate is used as is during scheduling. If distribution is 'PERT', the estimate (E) used is calculated based on the entered optimistic- (O), pessimistic-(P) and most likely (M) estimate. The formula used for this is: E = (O + 4 * M + P) / 6. |
Planned Start | The scheduled start time. |
Planned Finish | The scheduled finish time. |
Scheduler | The scheduler used for calculating the project schedule.
The default built-in scheduler is the Network Scheduler. Other schedulers presently available is RCPS if libRCPS is installed on your system. RCPS is a genetics based resource constrained project scheduler |
Configuration
Next | |
Project Performance View |